Home

The Plane

FLYING!
   
More Flying
    Oshkosh 2009  
    Painting Epic
    Beyond Phase 1

   
First Flight
The Shop
Empennage
  
Kit Arrival
   Horizontal Stab
  
Vertical Stab
  
Rudder
   Elevators
        Fiberglass Tips
Wings       
   
Left Wing
    Left Tank 
   
Right Wing
   
Right Tank
   
Ailerons
   
Flaps
Fuselage
   
Bulkheads
   
Longerons and Aft Fuselage
    Center Section
    Forward Section
    Cabin & Top
   
Cabin & Top  (Part II)
   
Cabin & Top  (Part III)
   
Final Assembly (Part IV)
   
Final Assembly (Part V)
Panel
    Panel 1
   
Panel 2
Electrical

   
Electrical (Part II)
   
Loads Analysis (download)
Finish
   
Canopy
   
Cowling
   
Firewall Forward
        
Engine  Selection Matrix
   
Baffles
   
Airport
Paint Scheme Ideas
Other Stuff
   
Links
   
Ideas

 
   Oshkosh 2007
    Old CA Flying Area
    Local WA Flying Area
   
Spaces Blog

e-mail: piavis "at" comcast.net
Last updated 09/27/09